Manufacturer: Sat-System Sp. z o.o.

Project — the station in Trawniki

Client: PKP SA  ·  Trawniki  ·  2024

As part of the modernisation of the railway station in Trawniki, we carried out comprehensive telecommunication installations that ensure the modern and safe operation of the facility.

The scope of work included:

  • A PSIM (Physical Security Information Management) system for integrating and managing security systems.
  • A CCTV system for video monitoring.
  • An Access Control System for managing access to the facility.
  • An Intruder and Hold-up Alarm System (SSWiN).
  • An SOS System for alerting in emergency situations.
  • A structured cabling system with active LAN devices.
  • A BMS (Building Management System) for managing the building.
  • Ticket-office intercom.
  • Dynamic Passenger Information System (CSDIP).
  • Clock System.
  • Integration of the CSDIP system with the signal box.

On completion of the work, full as-built documentation was prepared, confirming the conformity of the delivery with the design and the highest quality standards.

Interesting facts about the station in Trawniki

The station in Trawniki is a historic building from the 1920s that underwent a thorough renovation. During the work, the historic appearance of the façade was restored, the window and door joinery was replaced and the interiors were adapted to the needs of travellers and service premises. The modernisation also included the installation of building management (BMS) systems, monitoring and energy-efficient lighting, which significantly increased the comfort and safety of users.

Other projects